For contractors

Keep building, and know your margin from day one.

Most contractors find out what a job really made after handover, and only once someone has sorted the receipts. In SakuProyek every bag of cement, every day a worker is on site and every progress bill goes straight into the project's books. You can check where it stands any time, not just at the end.

Indonesian · Rupiah · Web for the office, Android for the site

The Profit tab of a three-storey shophouse project: contract value, revenue recognised, gross profit, and a cost-control table comparing the bill-of-quantities budget with actual cost for materials, labour, subcontract, equipment and overhead.
  • Bill of quantities from Excel
  • Planned vs actual S-curve
  • Progress billing and retention
  • Attendance from a phone
  • Profit per project
Site and office

What happens on site reaches the office the same day

The usual story: receipts pile up in the site manager's drawer, attendance lives in an exercise book, and the office only sees the numbers when it is time to bill. SakuProyek cuts that out.

1

The site records on a phone

The foreman fills in the crew's attendance and receives deliveries. The site manager writes the daily report with photos, enters petty-cash receipts and logs equipment use.

2

The office checks and bills

Progress is approved, Saturday wages are paid, supplier invoices are entered, and progress bills are raised from approved measurements. The journals write themselves.

3

The project's profit is readable

Actual cost is set against the bill of quantities by category: materials, labour, subcontract, equipment, overhead. A line running over shows up before the job is finished.

One set of books. Project profit, the company's income statement and the balance sheet all come from the same journals. There is no separate summary that can drift away from them.

Features

From bill of quantities to handover

Everything that usually lives in Excel, exercise books and WhatsApp groups, in one place.

Bill of quantities and unit-price analysis

Import the estimator's Excel file as it is. It is checked before anything is saved, and a bad row is reported by row and column. Each item's material, labour, equipment and subcontract coefficients come with it.

Schedule and S-curve

Give each item a start and finish date, and the schedule and planned S-curve build themselves from the item weights. Once progress is measured, the actual line appears beside the plan.

Progress measurement

Progress is recorded per item, cumulatively, and the project's progress is weighted from the bill of quantities. The site manager drafts it on a phone; the office approves it.

Advance, progress bills, retention

Bill the advance up front, each progress bill from an approved measurement, and the retention after final handover. Advance recovery, retention and final income tax are worked out for you. A draft prints as a payment request.

Materials straight to site

Materials are ordered for the project and received on site, without going through the office warehouse. They become cost only when they are used, so what is still lying on site stays visible.

Attendance, weekly wages, advances

The foreman marks 1, ½ or 0 per worker per day, plus overtime hours. On Saturday the wages are calculated and paid from petty cash, and any cash advance a worker took comes off their pay.

Lump-sum and subcontract work

A subcontracting company or a tradesman on a fixed price, it works the same way. Each payment comes from progress, less what has been paid, retention, tax and any advance.

Site petty cash

The site manager holds a fixed float. Each week the receipts are accounted for and the office tops it up by what was spent. Receipts not yet accounted for are visible too.

Own and hired equipment

Log use by the day or the hour, with fuel and operator. Your own equipment is charged to the project monthly. For hired equipment, the owner's invoice is recorded against it when it arrives.

Daily reports with photos

Weather morning, midday and afternoon, the day's work, problems, and up to four photos. Labour, materials and equipment for the day are already filled in from what was recorded.

A link for the client

Send one link and the client can follow physical progress, the S-curve and the last two weeks of daily reports with photos. No account needed, and not a single money figure on it.

Handover, maintenance, final handover

At first handover a maintenance provision is set up. Repairs during the maintenance period are charged to it, not to a new project. What is left is released at final handover, and the project is closed.

Revenue by progress

Choose how revenue is recognised: by measured physical progress (PSAK 72), by cost, or when bills are raised. The gap between progress and billing is journalled at each month end.

Contract addenda

Variations are recorded as an addendum. The contract value changes with it, and the next progress bill uses the new value.

Staff payroll and income tax

Site managers and project admins are paid monthly, with PPh 21 at the TER rates. Their pay can be split across projects by percentage, so each project carries its share of site overhead.

Full company accounts

Income statement, balance sheet, cash flow, general ledger, supplier payables and client receivables. All from the same journals as the projects.

Billing

Progress bills without a calculator

Approve the measurement, press New bill, choose a progress bill. The gross comes from progress, less advance recovery and retention. Above the list is a summary of the contract, so you see straight away what has been billed, what has been paid and what is still outstanding.

  • The unrecovered advance is always shown
  • Retention held, then released after final handover
  • Final income tax withheld by the client is recorded
  • Bills print, or save as PDF
The project's billing tab: cards for contract value, progress billed, billed, receivable, advance and retention, above a list of the advance, progress bills one to four, and the retention release.
Schedule

Behind schedule? You find out this week, not next month

The schedule is built from each item's planned dates. A red line marks today, and the S-curve below it sets the plan against measured progress. If the job starts to slip, there is still time to catch up.

  • Dependencies between items
  • The schedule prints for site meetings
  • Earned value (SPI) per project on the dashboard
The project's schedule tab: one bar per work item, from preparation to the second-floor structure, with a red line marking today.
Phone app

A whole crew's attendance in a few taps

The foreman opens the project, presses All present, changes whoever worked half a day or did not turn up, and saves. Deliveries and material use are recorded from the same place. The site manager uses the same app for daily reports, petty-cash receipts, equipment use and draft measurements.

Everyone sees only the projects they are assigned to. A foreman cannot open the financial reports, and has no need to.

The attendance screen in the phone app: the project's labour tab with Save and All present buttons, then a card per worker with 1, half or 0 days and overtime hours.
AI and MCP

Ask the books, not your admin

The AI assistant inside the app reads your company's projects, bills of quantities and books. The AI comes ready through SakuAgent, and your own AI agent can connect over MCP too.

The SakuProyek assistant

Ask it the way you would ask the office: "which project has the thinnest margin?" or "how much progress billing is still unpaid?". It can also add bill of quantities items with their unit price analysis, draft journals, and prepare purchase orders for materials.

SakuAgent, AI ready to use

The AI behind the assistant is ready for you. You need no AI subscription and no token of your own, just pick a model. Monthly tokens and web searches follow your plan, and usage shows in the AI Integration (MCP) menu.

The same access as you

The assistant works as the person asking. A foreman using it still cannot see prices or financial reports. Every change it makes is recorded under that person's name.

Look up prices on the web

Need this week's price of cement or steel, or the latest regulation? The assistant can search the web and names its sources. It is instructed not to put your company's data into search queries.

MCP for your AI agent

The company owner can issue MCP credentials for any AI application that supports it. Each credential works for one company only, and only for the tools you tick. It can be revoked at any time.

Or bring your own AI

Already subscribe to another AI service? Enter its endpoint and token, and the assistant uses that service instead. The token is stored encrypted, and its usage does not count against the SakuAgent quota.

Who it is for

Who uses it

Building contractors

Shophouses, homes, warehouses, small buildings. Lump-sum jobs with progress billing and retention.

Owners

Who want to know which jobs make money and which do not, without waiting for a report from the office.

Admin and finance

Receipts, wages, bills and tax are already recorded. Month end is a check, not a second round of typing.

Site managers and foremen

Report from site on a phone, instead of sending photos of receipts to the group one by one.

Contractors with several companies

One account for several companies, separate books, and no signing in again to switch.

Plainly

What is not there yet

Better you know now. This is what SakuProyek cannot do today.

Planned

e-Faktur and Coretax

VAT and final income tax are calculated and journalled correctly. Tax invoice numbering and reporting to the tax office are not connected yet, so that step is still done outside the app.

Partly available

The app on Play Store

The Android app works and is used on site, but it is installed from an APK file we send you. There is no iPhone app yet; use the browser there.

Planned

A warehouse per project

Materials are recorded directly at the project site. Separate warehouses per project, each with its own stock, are not there yet.

Partly available

BPJS and withholding slips

Staff payroll includes PPh 21 and payslips. BPJS deductions and the 1721-A1 withholding slip are not there yet, and PPh 21 for daily workers is not calculated automatically.

FAQ

Questions people ask

My bill of quantities is in Excel. Do I retype it?

No. Download the template, copy your bill of quantities into it, and import it. It is checked before it is saved, and if something is wrong you are told which row and column.

My foreman is not great with phones. Will it work?

Yes. The attendance screen is the workers' names and three choices: 1, ½ or 0. Usually it is All present, change one or two people, save.

Can the client follow progress?

Yes, through a link you create yourself and can revoke at any time. It shows physical progress, the S-curve and daily reports with photos. Costs and profit are not on it.

Do I need to know accounting?

Not for day-to-day work. The journals come from attendance, receipts, measurements and bills. Accounting knowledge only matters when reading the financial statements or making a manual journal.

Is there a manual?

Yes, in Indonesian, at docs.sakuproyek.id. It follows one three-storey shophouse from contract to close, with a picture of every step, and it can be downloaded as a PDF.

Can the AI assistant change data without my knowing?

The assistant can only do what the person asking is allowed to do, and every change it makes is recorded under that person's name. Before it changes anything, it is instructed to explain what it is about to do. Journals are created as drafts and posted only when you ask.

The AI assistant with SakuAgent, and MCP, are available on selected plans.

Is my data safe?

Each company's books are stored separately and access is set by role. Every change records who made it, and that record cannot be deleted from inside the app.

See it with a project like yours

We will walk you through it from bill of quantities to project profit, using an example close to your own work.