/*
 * SakuProyek — what differs from SakuKasir's page, and nothing else.
 *
 * Both sites share styles.css. This sheet loads after it and swaps the palette for the
 * one SakuProyek's application, sign-in page and manual use (src/product.ts in frontend:
 * deep orange, the colour of a site), so the screenshots sit on a page of the same colour
 * instead of a blue one. The few places styles.css spells a colour out rather than naming
 * a variable are restated here in orange.
 */

:root {
  --primary: #bf360c;
  --secondary: #d84315;
  --accent: #ff8a65;

  /* The neutrals in styles.css lean blue, to sit beside indigo. Beside orange that reads
     cold, so the washes and lines move to the warm side by the same small step. */
  --ink: #23140f;
  --body: #4d413c;
  --muted: #7a6b65;
  --line: #f0e4de;
  --wash: #fbf7f5;
  --wash-deep: #f7eee9;
}

.btn-primary {
  box-shadow: 0 6px 18px rgba(191, 54, 12, 0.24);
}

.hero {
  background:
    radial-gradient(1100px 460px at 12% -8%, #fde7dd 0%, rgba(253, 231, 221, 0) 62%),
    linear-gradient(180deg, var(--wash) 0%, var(--white) 78%);
}

.cta {
  background: linear-gradient(135deg, var(--primary) 0%, #d84315 55%, var(--accent) 100%);
}

/* The phone screenshot is portrait: the same narrow column as SakuKasir's receipt. */
.split-media.phone {
  display: flex;
  justify-content: center;
}

.split-media.phone img {
  max-width: 300px;
}

.btn-ghost {
  border-color: #efc9b9;
}

/* The footer's grey leans blue in styles.css; on the dark brown ink it reads as a
   different page. And a link on that dark ground needs the light accent, not the
   primary, or it is barely legible. */
.site-footer,
.footer-col a {
  color: #c9b8b0;
}

.footer-bottom a {
  color: var(--accent);
}
